Objective | Standards Addressed by Projects | Projects Addressing StandardsA | PHMSA |
---|---|---|---|
Strengthening Standards | 43 | 110 | $51.55M |
No. | Organization Name | Standards Addressed by Projects |
Projects Addressing StandardsA |
PHMSAA |
---|---|---|---|---|
1. | American Society of Mechanical Engineers (ASME) | 7 | 21 | $ 9.32M |
2. | American Petroleum Institute (API) | 10 | 26 | $11.41M |
3. | NACE International (NACE) | 14 | 27 | $ 6.37M |
4. | National Fire Protection Association (NFPA) | 1 | 6 | $ 2.48M |
5. | American Society for Testing and Materials (ASTM) | 6 | 7 | $ 3.39M |
6. | Det Norske Veritas (DNV) | 1 | 1 | $ 0.17M |
7. | American Welding Society (AWS) | 3 | 3 | $ 1.36M |
8. | Society for Protective Coatings (SSPC) | 1 | 1 | $ 0.14M |
No. | Organization Name | % AddressedA, B |
% RevisedC |
Standard Relevance CountD |
Impact Meter |
---|---|---|---|---|---|
1. | American Petroleum Institute (API) | 18% | 30% | 26 | |
2. | American Society of Mechanical Engineers (ASME) | 14% | 0% | 21 | |
3. | American Society for Testing and Materials (ASTM) | 4% | 0% | 7 | |
4. | American Welding Society (AWS) | 2% | 0% | 3 | |
5. | Det Norske Veritas (DNV) | 0% | 0% | 1 | |
6. | NACE International (NACE) | 18% | 7% | 27 | |
7. | National Fire Protection Association (NFPA) | 4% | 0% | 6 | |
8. | Society for Protective Coatings (SSPC) | 0% | 0% | 1 |
Seq | Standard # | Standard Title | Projects Addressing Standard |
Projects Used to Impact Standard |
Identified Impacting Projects | PHMSA | SDO File |
---|---|---|---|---|---|---|---|
American Petroleum Institute (API) | |||||||
1. | API 939-D | Technical Report - Stress Corrosion Cracking of Carbon Steel in Fuel Grade Ethanol: Review and Survey, Second Edition | 2 | $ 0.25M | |||
2. | API 939-E | Technical Bulletin - Identification, Repair, and Mitigation of Cracking of Steel Equipment in Fuel Ethanol Service | 2 | $ 0.25M | |||
3. | Publ 1163 | In-line Inspection Systems Qualification Standard | 1 | $ 0.56M | |||
4. | RP 1166 | Excavation Monitoring and Observation | 1 | $ 0.07M | |||
5. | RP 1177 | Recommended Practice for Steel Pipeline Construction Quality Management Systems, 1st Edition | 1 | 1 | #504 | $ 0.30M | ![]() |
6. | RP 1183 | Assessment and Management of Dents in Pipelines | 5 | 5 | #146 #238 #358 #555 #557 |
$ 4.53M | ![]() |
7. | RP 579 | Fitness-for-Service | 2 | $ 0.89M | |||
8. | Spec 5L | Specification for Line Pipe | 1 | $ 0.14M | |||
9. | Std 1104 | Welding of Pipelines and Related Facilities | 9 | 2 | #128 #133 |
$ 3.87M | /matrix/FilGet.rdm?fil=3646 |
10. | TR 939-D | Stress Corrosion Cracking of Carbon Steel in Fuel Grade Ethanol | 2 | $ 0.51M | |||
American Society of Mechanical Engineers (ASME) | |||||||
1. | B31.12 | Hydrogen Piping and Pipelines | 4 | $ 1.55M | |||
2. | B31.3 | 2004 Process Piping | 1 | $ 0.14M | |||
3. | B31.4 | Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids | 4 | $ 1.63M | |||
4. | B31.8 | Gas Transmission and Distribution Piping Systems | 7 | $ 4.10M | |||
5. | B31.8 BS 7910 | Gas Transmission and Distribution Piping Systems | 1 | $ 0.17M | |||
6. | B31.8S | Managing System Integrity of Gas Pipelines | 3 | $ 0.83M | |||
7. | B31G/RSTRENG | Manual: Determining Remaining Strength of Corroded Pipelines | 1 | $ 0.87M | |||
American Society for Testing and Materials (ASTM) | |||||||
1. | D-4806 | Specification for Denatured Fuel Ethanol for Blending with Gasolines for Use as Automotive Spark-Ignition Engine Fuel | 2 | $ 0.51M | |||
2. | D2513 | Standard Specification for Thermoplastic Gas Pressure Pipe, Tubing, and Fittings | 1 | $ 0.58M | |||
3. | D2657 | Standard Practice for Heat Fusion Joining of Polyolefin Pipe and Fittings | 1 | $ 0.58M | |||
4. | E1820 | Standard Test Method for Measurement of Fracture Toughness | 1 | $ 0.80M | |||
5. | E1961-98(2003)e1 | Standard Practice for Mechanized Ultrasonic Examination of Girth Welds Using Zonal Discrimination with Focused Search Un | 1 | $ 0.35M | |||
6. | E2472-06 | Standard Test Method for Determination of Resistance to Stable Crack Extension under Low-Constraint Conditions | 1 | $ 0.55M | |||
American Welding Society (AWS) | |||||||
1. | A5.X | Filler Metal Specifications | 1 | $ 0.60M | |||
2. | B4.0 | Standard Methods for Mechanical Testing of Welds | 1 | $ 0.60M | |||
3. | D10.12 | Guide for Welding Mild Steel Pipe | 1 | $ 0.14M | |||
Det Norske Veritas (DNV) | |||||||
1. | DNV RP F-101 | Submarine Pipeline Systems, October 2005 | 1 | $ 0.17M | |||
NACE International (NACE) | |||||||
1. | RP 0105-2005 | Liquid-Epoxy Coatings | 1 | $ 0.14M | |||
2. | RP 0169 | Control of External Corrosion on Underground or Submerged Metallic Piping Systems | 1 | $ 0.08M | |||
3. | RP 0169-2002 | Control of External Corrosion on Underground or Submerged Metallic Piping Systems | 1 | $ 0.45M | |||
4. | RP 0178-2003 | Fabrication Details, Surface Finish Requirements, and Proper Design Considerations for Tanks and Vessels to Be Lined for | 1 | $ 0.14M | |||
5. | RP 0204-2004 | Stress Corrosion Cracking (SCC) Direct Assessment Methodology | 2 | $ 0.73M | |||
6. | RP 0303-2003 | Field-Applied Heat-Shrinkable Sleeves | 1 | $ 0.14M | |||
7. | RP 0394-94 | Application, Performance, and Quality Control of Plant-Applied, Fusion-Bonded Epoxy External Pipe Coating | 1 | $ 0.24M | |||
8. | RP 0502 | Pipeline External Corrosion Direct Assessment Methodology | 12 | $ 2.95M | |||
9. | RP 0694-94 | Commercial Blast Cleaning? | 1 | $ 0.24M | |||
10. | SP 0206-2006 | Internal Corrosion Direct Assessment Methodology for Pipelines Carrying Normally Dry Natural Gas (DG-ICDA) | 1 | $ 0.19M | |||
11. | SP 0502 | Pipeline External Corrosion Direct Assessment Methodology | 1 | $ 0.25M | |||
12. | TG 294 | Above ground testing for coating condition assessment | 1 | $ 0.13M | |||
13. | TG 305 | Wet Gas ICDA Standard | 2 | 1 | #177 | $ 0.47M | ![]() |
14. | TG 315 | Liquid Petroleum ICDA Standard | 1 | 1 | #167 | $ 0.18M | ![]() |
National Fire Protection Association (NFPA) | |||||||
1. | 59A | Standard for the Production, Storage, and Handling of Liquefied Natural Gas | 6 | $ 2.48M | |||
Society for Protective Coatings (SSPC) | |||||||
1. | SSPC-PA1 | Shop, Field, and Maintenance Painting | 1 | $ 0.14M |
SDO | Projects Addressing Standards |
Project Results Used to Revise a Standard |
---|---|---|
Category: Threat Prevention | ||
American Petroleum Institute (API) | 2 | 1 |
American Society of Mechanical Engineers (ASME) | 1 | |
Category Sub-Totals: | 3 | 1 |
Category: Anomaly Detection | ||
American Society of Mechanical Engineers (ASME) | 1 | |
NACE International (NACE) | 19 | 2 |
Category Sub-Totals: | 20 | 2 |
Category: Anomaly Characterization | ||
American Petroleum Institute (API) | 6 | 5 |
American Society of Mechanical Engineers (ASME) | 2 | |
NACE International (NACE) | 3 | |
Category Sub-Totals: | 11 | 5 |
Category: Anomaly Repair | ||
American Petroleum Institute (API) | 2 | |
American Society of Mechanical Engineers (ASME) | 2 | |
Category Sub-Totals: | 4 | 0 |
Category: Materials | ||
American Petroleum Institute (API) | 2 | |
American Society of Mechanical Engineers (ASME) | 6 | |
American Society for Testing and Materials (ASTM) | 1 | |
American Welding Society (AWS) | 1 | |
Det Norske Veritas (DNV) | 1 | |
NACE International (NACE) | 5 | |
Society for Protective Coatings (SSPC) | 1 | |
Category Sub-Totals: | 17 | 0 |
Category: Welding | ||
American Petroleum Institute (API) | 8 | 2 |
American Society of Mechanical Engineers (ASME) | 6 | |
American Society for Testing and Materials (ASTM) | 2 | |
American Welding Society (AWS) | 2 | |
Category Sub-Totals: | 18 | 2 |
Category: Joining | ||
American Society for Testing and Materials (ASTM) | 2 | |
Category Sub-Totals: | 2 | 0 |
Category: Alternative Fuels | ||
American Petroleum Institute (API) | 6 | |
American Society of Mechanical Engineers (ASME) | 3 | |
American Society for Testing and Materials (ASTM) | 2 | |
Category Sub-Totals: | 11 | 0 |
Category: Liquefied Natural Gas | ||
National Fire Protection Association (NFPA) | 6 | |
Category Sub-Totals: | 6 | 0 |
Grand Totals: | 92 | 10 |
No. | Project Title | Project StatusA | SDO | Standard No/Title | Impact StatusA | Confirmed | SDO Notes | File |
---|---|---|---|---|---|---|---|---|
Threat Prevention | ||||||||
1. | Quality Management Systems for Pipelines | Cancelled | ||||||
2. | Development and Validation of a Probabilistic Method for Estimating Accumulated Strain and Assessing Strain Demand and Capacity on Existing Pipelines | Active | ||||||
3. | Design and Placement of Compact Service Regulators | Active | ||||||
4. | Dynamic Geohazard Risk and Decision Support Platform | Active | ||||||
5. | Developing Corrosion Control Monitoring Technology for Hazardous Liquid Breakout Tanks | Active | ||||||
6. | Monitoring the Long-Term Compatibility of VCI and CP Associated Components | Active | ||||||
7. | Effectiveness of Prevention Methods for Excavation Damage | Closed | API | RP 1166, "Excavation Monitoring and Observation" | Out For Revision | 09/28/2007 | Forwarded to committee officers for use in revising standard. |
|
8. | Improving Quality Management Systems (QMS) for Pipeline Construction Activities | Closed | API | RP 1177, "Recommended Practice for Steel Pipeline Construction Quality Management Systems, 1st Edition" | Standard Revised | 01/19/2018 | API File... | |
9. | Effectiveness of Prevention Methods for Excavation Damage | Closed | ASME | B31.8S, "Managing System Integrity of Gas Pipelines" | Out For Revision | 09/13/2007 | Forwarded to committee officers for use in revising standard. | |
Leak Detection | ||||||||
10. | Odorant Effectiveness | Closed | ||||||
11. | Improving the Reliability, Detection, and Accuracy Capabilities of Existing Leak Detection Systems (CPMs) Using Machine Learning | Closed | ||||||
12. | Improve Pipeline Leak Rate Estimation | Closed | ||||||
Anomaly Detection | ||||||||
13. | Integrated Internal Inspection and Cleaning Tool Technology for Pipelines | Cancelled | ||||||
14. | In-Ditch Validation Methodology for Determination of Defect Sizing | Closed | ||||||
15. | A Novel Approach to Establishing Remaining Strength of Line Pipe and Fittings with Corrosion Type Defects | Closed | ||||||
16. | A Novel Structured Light Based Sensing and Probabilistic Diagnostic Technique for Pipe Internal Corrosion Detection and Localization | Closed | ||||||
17. | Improve ILI Sizing Accuracy | Closed | ||||||
18. | Validate In-Line Inspection (ILI) Capabilities to Detect/Characterize Mechanical Damage | Completed | ||||||
19. | Stress Corrosion Cracking Prioritization and Decision Making Using a Bayesian Network Approach | Closed | ||||||
20. | Assessment of Nondestructive Examination (NDE) and Condition Monitoring Technologies for Defect Detection in Non-Metallic Pipe | Active | ||||||
21. | Pipeline Segment-Specific External Corrosion Rate Estimation to Improve Reassessment Interval Accuracy | Closed | ASME | B31.8S, "Managing System Integrity of Gas Pipelines" | Not Determined | |||
22. | Improvements to the External Corrosion Direct Assessment Methodology by Incorporating Soils Data | Closed | NACE | RP 0502, "Pipeline External Corrosion Direct Assessment Methodology" | Out For Revision | 10/30/2007 | Forwarded to committee officers for use in revising standard. | |
23. | Internal Corrosion Direct Assessment (ICDA) of Gas Transmission, Gathering, and Storage Systems | Closed | NACE | SP 0206-2006, "Internal Corrosion Direct Assessment Methodology for Pipelines Carrying Normally Dry Natural Gas (DG-ICDA)" | Out For Revision | 10/30/2007 | Forwarded to committee officers for use in revising standard. |
|
24. | Determining Integrity Reassessment Intervals Through Corrosion Rate Modeling And Monitoring | Closed | NACE | RP 0502, "External Corrosion Direct Assessment" | Out For Revision | 10/30/2007 | Forwarded to committee officers for use in revising standard. |
|
25. | Task Order #1: External Corrosion of Line Pipe Steels | Closed | NACE | RP 0502, "Pipeline External Corrosion Direct Assessment Methodology" | Not Determined | 10/30/2007 | ||
26. | Task Order #1: External Corrosion of Line Pipe Steels | Closed | NACE | RP 0169-2002, "Control of External Corrosion on Underground or Submerged Metallic Piping Systems" | Not Determined | 10/30/2007 | ||
27. | Applying External Corrosion Direct Assessment (ECDA) to Difficult to Inspect Areas | Closed | NACE | RP 0502, "Pipeline External Corrosion Direct Assessment Methodology" | Out For Revision | 10/30/2007 | Forwarded to committee officers for use in revising standard. |
|
28. | Development of ICDA for Liquid Petroleum Pipelines | Closed | NACE | TG 315, "Liquid Petroleum ICDA Standard" | Standard Revised | 10/30/2007 | NACE File... | |
29. | Evaluation and Validation of Aboveground Techniques for Coating Condition Assessment | Closed | NACE | TG 294, "Above ground testing for coating condition assessment" | Out For Revision | 10/30/2007 | Forwarded to committee officers for use in revising standard. |
|
30. | Direct Assessment for Internal Corrosion in the Presence of Wet Gas | Closed | NACE | TG 305, "Wet Gas ICDA Standard" | Standard Revised | 10/30/2007 | NACE File... | |
31. | Internal Corrosion Direct Assessment Detection of Water | Closed | NACE | TG 305, "Wet Gas ICDA Standard" | Not Determined | 10/30/2007 | ||
32. | Guidelines for Interpretation of Close Interval Surveys for ECDA | Closed | NACE | RP 0502, "Pipeline External Corrosion Direct Assessment Methodology" | Not Determined | 10/30/2007 | ||
33. | Demonstration of ECDA Applicability and Reliability for Demanding Situations | Closed | NACE | RP 0502, "Pipeline External Corrosion Direct Assessment Methodology" | Not Determined | 10/30/2007 | ||
34. | ECDA for Unique Threats to Underground Pipelines | Closed | NACE | RP 0502, "Pipeline External Corrosion Direct Assessment Methodology" | Not Determined | 10/30/2007 | ||
35. | Guidelines for the Identification of SCC Sites and the Estimation of Re-Inspection Intervals for SCCDA | Closed | NACE | RP 0204-2004, "Stress Corrosion Cracking (SCC) Direct Assessment Methodology" | Not Determined | 10/30/2007 | ||
36. | Phase Sensitive Methods to Detect Cathodic Disbondment | Closed | NACE | RP 0502, "Pipeline External Corrosion Direct Assessment Methodology" | Not Determined | 10/30/2007 | ||
37. | External Corrosion Direct Assessment of Cased Pipes | Closed | NACE | RP 0502, "Pipeline External Corrosion Direct Assessment Methodology" | Not Determined | |||
38. | Severity Ranking of ECDA Indirect Inspection Indications | Closed | NACE | RP 0502, "Pipeline External Corrosion Direct Assessment Methodology" | Not Determined | |||
39. | External Corrosion Direct Assessment - Potential Measurements on Paved Areas | Closed | NACE | RP 0502, "Pipeline External Corrosion Direct Assessment Methodology" | Not Determined | |||
40. | Pipeline Segment-Specific External Corrosion Rate Estimation to Improve Reassessment Interval Accuracy | Closed | NACE | RP 0502, "Pipeline External Corrosion Direct Assessment Methodology" | Not Determined | |||
Anomaly Characterization | ||||||||
41. | Development of a Model to Accurately Predict the Conditions of Carrier Pipe within Casings Based on Conditions at the Casing Ends | Cancelled | ||||||
42. | Threat/Anomaly Mitigation Decision-Making Process | Closed | ||||||
43. | Definition of Geotechnical and Operational Load Effects on Pipeline Anomalies | Closed | ||||||
44. | Improve Dent/Cracking Assessment Methods | Closed | ||||||
45. | Systematize 20 Years of Mechanical Damage Research | Closed | ||||||
46. | Mechanical Damage at Welds | Closed | API | RP 1183, "Assessment and Management of Dents in Pipelines" | Standard Revised | 02/25/2020 | API File... | |
47. | Characterization of Stress Corrosion Cracking Using Laser Ultrasonics | Closed | API | Publ 1163, "In-line Inspection Systems Qualification Standard" | Out For Revision | 09/28/2007 | Forwarded to committee officers for use in revising standard. | |
48. | Structural Significance of Mechanical Damage | Closed | API | RP 1183, "Assessment and Management of Dents in Pipelines" | Standard Revised | 02/25/2020 | API File... | |
49. | Dent Fatigue Life Assessment - Development of Tools for Assessing the Severity and Life of Dent Features | Closed | API | RP 1183, "Assessment and Management of Dents in Pipelines" | Standard Revised | 02/25/2020 | API File... | |
50. | Consolidated Project Full Scale Testing of Interactive Features for Improved Models | Closed | API | RP 1183, "Assessment and Management of Dents in Pipelines" | Standard Revised | 02/25/2020 | API File... | |
51. | Improving Models to Consider Complex Loadings, Operational Considerations, and Interactive Threats | Closed | API | RP 1183, "Assessment and Management of Dents in Pipelines" | Standard Revised | 02/25/2020 | API File... | |
52. | Structural Significance of Mechanical Damage | Closed | ASME | B31.8, "Gas Transmission and Distribution Piping Systems" | Not Determined | |||
53. | Validation for Flaw Acceptance of Mechanical Damage to Low Stress Natural Gas Pipelines | Closed | ASME | B31.8, "Gas Transmission and Distribution Piping Systems" | Not Determined | |||
54. | High CP Potential Effects on Pipelines | Closed | NACE | RP 0169, "Control of External Corrosion on Underground or Submerged Metallic Piping Systems" | Out For Revision | 10/30/2007 | Forwarded to committee officers for use in revising standard. |
|
55. | Model Modules to Assist Assessing and Controlling Stress Corrosion Cracking (SCC) | Closed | NACE | RP 0204-2004, "Stress Corrosion Cracking (SCC) Direct Assessment Methodology" | Not Determined | 10/30/2007 | ||
56. | Validation of External Corrosion Growth-Rate Using Polarization Resistance and Soil Properties | Closed | NACE | SP 0502, "Pipeline External Corrosion Direct Assessment Methodology" | Not Determined | |||
Anomaly Repair | ||||||||
57. | Selection of Pipe Repair Methods | Closed | ||||||
58. | Repair/Replacement Considerations for Pre-Regulation Pipe | Closed | ||||||
59. | Pipeline Assessment and Repair Manual | Closed | API | RP 579, "Fitness-For-Service" | Not Determined | |||
60. | Pipeline Assessment and Repair Manual | Closed | API | Std 1104, "Welding of Pipelines and Related Facilities" | Out For Revision | 09/28/2007 | Forwarded to committee officers for use in revising standard. |
|
61. | Pipeline Assessment and Repair Manual | Closed | ASME | B31.4, "Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids" | Not Determined | |||
62. | Pipeline Assessment and Repair Manual | Closed | ASME | B31.8, "Gas Transmission and Distribution Piping Systems" | Not Determined | |||
Pipe Remediation/Rehabilitation | ||||||||
63. | Evaluation of Structural Liners for the Rehabilitation of Liquid and Natural Gas Piping Systems | Closed | ||||||
Design | ||||||||
64. | Realistic Strain Capacity Models for Pipeline Construction and Maintenance | Closed | ||||||
65. | Strain-Based Design and Assessment of Segments of Pipelines with and without Fittings | Closed | ||||||
66. | Standardize the Application of Vapor Corrosion Inhibitors | Active | ||||||
Materials | ||||||||
67. | External Pipeline Coating Integrity | Closed | ||||||
68. | Comprehensive Study to Understand Longitudinal Electric Resistance Welded (ERW) Seam Failures | Closed | ||||||
69. | Effects of Hydrocarbon Permeation on Plastic Pipe Strength and Fusion Performance | Closed | ||||||
70. | Investigating the Integrity Impacts of Hydrogen Gas on Composite/Multi-Layered Pipe | Active | ||||||
71. | Improved In-field Welding and Coating Protocols | Closed | API | Std 1104, "Welding of Pipelines and Related Facilities" | Out For Revision | 09/28/2007 | Forwarded to committee officers for use in revising standard. | |
72. | Improved In-field Welding and Coating Protocols | Closed | API | Spec 5L, "Specification for Line Pipe" | Not Determined | |||
73. | Task Order #2: Fatigue Fracture and Crack Arrest in High-Strength Pipeline Steels | Closed | ASME | B31.8S, "Managing System Integrity of Gas Pipelines" | Not Determined | |||
74. | Corrosion Assessment Guidance for Higher Strength Pipelines | Closed | ASME | B31G/RSTRENG, "Manual: Determining Remaining Strength of Corroded Pipelines" | Not Determined | |||
75. | Behavior of Corroded Pipelines Under Cyclic Pressure | Closed | ASME | B31.8 BS 7910, "Gas Transmission and Distribution Piping Systems" | Not Determined | |||
76. | Improved In-field Welding and Coating Protocols | Closed | ASME | B31.3, "2004 Process Piping" | Not Determined | |||
77. | Improved In-field Welding and Coating Protocols | Closed | ASME | B31.4, "Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids" | Not Determined | |||
78. | The Effect of Pressurized Hydrogen Gas on the Fatigue Properties of the Heat-Affected Zones in X52 and X70 Pipelines | Closed | ASME | B31.12, "Hydrogen Piping and Pipelines" | Not Determined | |||
79. | Task Order #2: Fatigue Fracture and Crack Arrest in High-Strength Pipeline Steels | Closed | ASTM | E2472-06, "Standard Test Method for Determination of Resistance to Stable Crack Extension under Low-Constraint Conditions" | Not Determined | |||
80. | Improved In-field Welding and Coating Protocols | Closed | AWS | D10.12, "Guide for Welding Mild Steel Pipe" | Not Determined | |||
81. | Behavior of Corroded Pipelines Under Cyclic Pressure | Closed | DNV | DNV RP F-101, "Submarine Pipeline Systems, October 2005" | Not Determined | |||
82. | Improved In-field Welding and Coating Protocols | Closed | NACE | RP 0105-2005, "Liquid-Epoxy Coatings" | Not Determined | 10/30/2007 | ||
83. | Improved In-field Welding and Coating Protocols | Closed | NACE | RP 0178-2003, "Fabrication Details, Surface Finish Requirements, and Proper Design Considerations for Tanks and Vessels to Be Lined for" | Not Determined | 10/30/2007 | ||
84. | Improved In-field Welding and Coating Protocols | Closed | NACE | RP 0303-2003, "Field-Applied Heat-Shrinkable Sleeves" | Not Determined | 10/30/2007 | ||
85. | Effect of Surface Preparation on Residual Stress in Multi-layer and Other Pipeline Coatings | Closed | NACE | RP 0394-94, "Application, Performance, and Quality Control of Plant-Applied, Fusion-Bonded Epoxy External Pipe Coating" | Not Determined | 10/30/2007 | ||
86. | Effect of Surface Preparation on Residual Stress in Multi-layer and Other Pipeline Coatings | Closed | NACE | RP 0694-94, "Commercial Blast Cleaning?" | Not Determined | |||
87. | Improved In-field Welding and Coating Protocols | Closed | SSPC | SSPC-PA1, "Shop, Field, and Maintenance Painting" | Not Determined | |||
Welding | ||||||||
88. | Optimization of Multi-Wire GMAW Welding Procedure for Heavy-Wall Offshore Pipeline Construction | Cancelled | ||||||
89. | A Comprehensive Update in the Evaluation of Pipelines Weld Defects | Closed | API | Std 1104, "Welding of Pipelines and Related Facilities" | Standard Revised | 09/28/2007 | API File... | |
90. | Improved Inspection and Assessment Methods for Pipeline Girth Welds and Repair Welds | Closed | API | Std 1104, "Welding of Pipelines and Related Facilities" | Standard Revised | 09/28/2007 | API File... | |
91. | Development of HAZ Hardness Limits for In-Service Welding | Closed | API | Std 1104, "Welding of Pipelines and Related Facilities" | Not Determined | |||
92. | Validation of Assessment Methods for Production Scale Girth Welding of High Strength Pipelines with Multiple Pipe Sources | Closed | API | Std 1104, "Welding of Pipelines and Related Facilities" | Not Determined | |||
93. | Validation of Assessment Methods for Production Scale Girth Welding of High Strength Pipelines with Multiple Pipe Sources | Closed | API | RP 579, "Fitness-for-Service" | Not Determined | |||
94. | Automated Laser Ultrasonic Testing (ALUT) Of Hybrid Laser Arc Welds For Pipeline Construction | Closed | API | Std 1104, "Welding of Pipelines and Related Facilities" | Not Determined | |||
95. | Update of Weld Design, Testing, and Assessment Procedures for High Strength Pipelines | Closed | API | Std 1104, "Welding of Pipelines and Related Facilities" | Not Determined | |||
96. | Development of Optimized Welding Solutions for X100 Linepipe Steel | Closed | API | Std 1104, "Welding of Pipelines and Related Facilities" | Not Determined | |||
97. | Validation of Assessment Methods for Production Scale Girth Welding of High Strength Pipelines with Multiple Pipe Sources | Closed | ASME | B31.8, "Gas Transmission and Distribution Piping Systems" | Not Determined | |||
98. | Update of Weld Design, Testing, and Assessment Procedures for High Strength Pipelines | Closed | ASME | B31.4, "Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids" | Not Determined | |||
99. | Update of Weld Design, Testing, and Assessment Procedures for High Strength Pipelines | Closed | ASME | B31.8, "Gas Transmission and Distribution Piping Systems" | Not Determined | |||
100. | Update of Weld Design, Testing, and Assessment Procedures for High Strength Pipelines | Closed | ASME | B31.8, "Hydrogen Piping and Pipelines" | Not Determined | |||
101. | Development of Optimized Welding Solutions for X100 Linepipe Steel | Closed | ASME | B31.4, "Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids" | Not Determined | |||
102. | Development of Optimized Welding Solutions for X100 Linepipe Steel | Closed | ASME | B31.8, "Gas Transmission and Distribution Piping Systems" | Not Determined | |||
103. | Improved Inspection and Assessment Methods for Pipeline Girth Welds and Repair Welds | Closed | ASTM | E1961-98(2003)e1, "Standard Practice for Mechanized Ultrasonic Examination of Girth Welds Using Zonal Discrimination with Focused Search Un" | Not Determined | |||
104. | Update of Weld Design, Testing, and Assessment Procedures for High Strength Pipelines | Closed | ASTM | E1820, "Standard Test Method for Measurement of Fracture Toughness" | Not Determined | |||
105. | Development of Optimized Welding Solutions for X100 Linepipe Steel | Closed | AWS | A5.X, "Filler Metal Specifications" | Not Determined | |||
106. | Development of Optimized Welding Solutions for X100 Linepipe Steel | Closed | AWS | B4.0, "Standard Methods for Mechanical Testing of Welds" | Not Determined | |||
Joining | ||||||||
107. | Butt Fusion Joint Integrity and Evaluation of NDE Technologies | Closed | ASTM | D2513, "Standard Specification for Thermoplastic Gas Pressure Pipe, Tubing, and Fittings" | Not Determined | |||
108. | Butt Fusion Joint Integrity and Evaluation of NDE Technologies | Closed | ASTM | D2657, "Standard Practice for Heat Fusion Joining of Polyolefin Pipe and Fittings" | Not Determined | |||
Alternative Fuels | ||||||||
109. | New Design and Construction Techniques for Transportation of Ethanol and Ethanol/Gasoline Blends in New Pipelines | Closed | ||||||
110. | Corrosion and Integrity Management of Biodiesel Pipelines | Cancelled | ||||||
111. | Technical and Economic Feasibility of Preventing SCC through Control of Oxygen | Closed | ||||||
112. | Feasibility of Chemical Inhibition of Ethanol SCC | Closed | ||||||
113. | Compatibility of Non-Ferrous Metals with Ethanol | Closed | ||||||
114. | SETTING SAFE LIMITS ON BIODIESEL CONSTITUENTS FOR PIPELINE INTEGRITY | Cancelled | ||||||
115. | Effect of Ethanol Source on Stress Corrosion Cracking of Carbon Steel | Closed | API | TR 939-D, "Stress Corrosion Cracking of Carbon Steel in Fuel Grade Ethanol" | Not Determined | |||
116. | Effect of Ethanol Blends and Batching Operations on Stress Corrosion Cracking of Carbon Steel | Closed | API | TR 939-D, "Stress Corrosion Cracking of Carbon Steel in Fuel Grade Ethanol" | Not Determined | |||
117. | Monitoring Conditions Leading to SCC/Corrosion of Carbon Steel | Closed | API | API 939-D, "Technical Report - Stress Corrosion Cracking of Carbon Steel in Fuel Grade Ethanol: Review and Survey, Second Edition" | Not Determined | |||
118. | Monitoring Conditions Leading to SCC/Corrosion of Carbon Steel | Closed | API | API 939-E, "Technical Bulletin - Identification, Repair, and Mitigation of Cracking of Steel Equipment in Fuel Ethanol Service" | Not Determined | |||
119. | Determine the Requirements for Existing Pipeline, Tank and Terminal Systems to Transport Ethanol without Cracking | Closed | API | API 939-D, "Technical Report - Stress Corrosion Cracking of Carbon Steel in Fuel Grade Ethanol: Review and Survey, Second Edition" | Not Determined | |||
120. | Determine the Requirements for Existing Pipeline, Tank and Terminal Systems to Transport Ethanol without Cracking | Closed | API | API 939-E, "Technical Bulletin - Identification, Repair, and Mitigation of Cracking of Steel Equipment in Fuel Ethanol Service" | Not Determined | |||
121. | Performance Evaluation of High-Strength Steel Pipelines for High-Pressure Gaseous Hydrogen Transportation | Closed | ASME | B31.12, "Hydrogen Piping and Pipelines" | Not Determined | |||
122. | Cost-Effective Techniques for Weld Property Measurement and Technologies for Improving Weld Hydrogen Embrittlement and Intergranular Stress Corrosion Cracking Resistance for Alternative Fuel Pipelines | Closed | ASME | B31.12, "Hydrogen Piping and Pipelines" | Not Determined | |||
123. | Effect of Microstructure of Pipeline Steels on Ductility and Fatigue Properties in High Pressure Hydrogen Atmosphere | Cancelled | ASME | B31.12, "Hydrogen Piping and Pipelines" | Not Determined | |||
124. | Effect of Ethanol Source on Stress Corrosion Cracking of Carbon Steel | Closed | ASTM | D-4806, "Specification for Denatured Fuel Ethanol for Blending with Gasolines for Use as Automotive Spark-Ignition Engine Fuel" | Not Determined | |||
125. | Effect of Ethanol Blends and Batching Operations on Stress Corrosion Cracking of Carbon Steel | Closed | ASTM | D-4806, "Specification for Denatured Fuel Ethanol for Blending with Gasolines for Use as Automotive Spark-Ignition Engine Fuel" | Not Determined | |||
Climate Change | ||||||||
126. | Developing Design and Welding Requirements Including Material Testing and Qualification of New and Existing Pipelines for Transporting CO2 | Active | ||||||
Other | ||||||||
127. | Review of Control System Testing Frequency | Cancelled | ||||||
128. | Review the Intent and Safety Impact of Hoop Stress and Percentage of Specified Minimum Yield Stress Boundaries on Natural Gas Transmission and Distribution Pipelines | Closed | ||||||
Liquefied Natural Gas | ||||||||
129. | Vapor Cloud Explosion at Nil Wind | Closed | ||||||
130. | Development of Guidance on Potential Cascading Effects from Flammable Vapor Cloud Explosions | Closed | ||||||
131. | Developing Performance Criteria for External Loading Factors on External Steel Shell Tanks | Completed | ||||||
132. | Liquefied Natural Gas Tanks Without Bottom Fill | Completed | ||||||
133. | Validation of Passive Mitigation Systems for Fires | Active | ||||||
134. | Modeling and Assessing a Spectrum of Accidental Fires and Risks in a LNG Facility | Closed | NFPA | 59A, "Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG)" | Out For Revision | 04/28/2008 | Forwarded to committee officers for use in revising standard. | |
135. | Consistency Review of Methodologies for Quantitative Risk Assessment | Closed | NFPA | 59A, "Standard for the Production, Storage, and Handling of Liquefied Natural Gas" | Not Determined | |||
136. | Performance Gap Comparison of Process Safety Management Consensus Standards and Regulatory Requirements for LNG Facilities | Closed | NFPA | 59A, "Standard for the Production, Storage, and Handling of Liquefied Natural Gas" | Not Determined | |||
137. | Evaluation of the Efficacy and Treatment of Hazard Mitigation Measures for LNG Facilities | Closed | NFPA | 59A, "Standard for the Production, Storage, and Handling of Liquefied Natural Gas" | Project Active/Pending | |||
138. | Develop a Risk-Based Approach and Criteria for Hazard Detection Layout | Closed | NFPA | 59A, "Standard for the Production, Storage, and Handling of Liquefied Natural Gas" | Project Active/Pending | |||
139. | Develop an Evaluation Protocol for Non-LNG Release Hazards - Modeling | Active | NFPA | 59A, "Standard for the Production, Storage, and Handling of Liquefied Natural Gas" | Project Active/Pending | |||
Underground Natural Gas Storage | ||||||||
140. | Risk Assessment and Treatment of Wells | Closed | ||||||
141. | Reliability of Subsurface Safety Valves | Closed | ||||||
142. | Tubing and Packers Life-Cycle Analysis for Underground Gas Storage Applications | Closed | ||||||
143. | Evaluation of Well Casing Integrity Management for Underground Storage Wells | Closed |